The projected multifunctional public center is located on the territory of the Baltic Plant in the southwestern part of Vasilyevsky Island. The complex forms the seafront facade of the quarter, completes the central axis, and restores the city dwellers’ access to the Bolshaya Neva, integrating into the green framework of the embankment. The architectural concept is based on a composition of ice blocks resembling an icebreaker breaking the ice at the boundary between water and land. The 55‑meter‑high hotel tower completes the street facade; the eastern wing includes shopping galleries and a food court, while the western wing houses offices and provides a through passage to the embankment.
In the center, there are two large-span performance halls.The layout is organized around an atrium that connects the hotel, the business center, the retail zone, and the halls. The ice theme is revealed through the structural glazing of the hotel, the white glass-fiber concrete of the halls, and the aluminum facades of the horizontal wings, which allude to the hull of an icebreaker and the shipbuilding past of the area.
Vasilyevsky Island, Saint Petersburg, Russia
A graduate of SPbGASU in 2026 with a degree in 07.03.01 “Architecture”. The thesis project was completed in the workshop of V. E. Lyavdansky, defended with honors, and nominated for the MOOsAO competition
Daniil Shevlyakov
Daniil Shevlyakov