Project
Carre Blanc

Category
Best Implemented Project of Residential or Mixed-Use Estate

About the project (provided by the applicant)
Built at Prechistenka Embankment, this residential development is located near the Christ the Savior Cathedral. The authors wanted their building to organically integrate into the existing context. Their design solutions are state-of-the-art but not aggressive or too flamboyant. This development was designed to get older with dignity. The facades are finished with natural stone, and their smooth contours create the feel of noble and true materiality. An ornament that reminds of the frescos used in temples and royal palaces in the 16th through 17th centuries was specially designed for this proposal.

Location
Moscow, Russia

Project implementation year
2023

Extra visual materials (photos, videos etc.)
https://www.dropbox.com/scl/fo/zj4kbpioj46m70hl36kmb/AHVmmHR-i4haZK4vI0nUxb0?rlkey=lbxuspk5dliht8amy64gaku5m&dl=0

Applicant
SPEECH architectural bureau

Authors of the project
Project by Sergey Choban, Igor Chlenov, and Alina Garnovskaya

Project status
Implemented

2024 USER’S ONLINE VOTING IS COMPLETED.

Thank you for your participation and support of the nominees!

Premio del Pubblico (People’s Choice) finalists, absolute winner and winners in the categories can be found here.

88