Project
Administrative Building of Pegah Dairy Factory
Category
Best Implemented Project of Public Building or Facility
About the project
We considered the Administrative Building of Pegah Dairy Factory as a biological complex.
By creating an opening in the main axis of the complex and with maximum visibility, the east elevation was formed. However, The west elevation, was shaped porous with the aim of climatic comfort with a brick facade.
Numerous building braces in the rhombic forms influenced the arrangement of bricks and openings.
The interiors were designed continuously, which simply responds to future developments as well. And In addition to increasing efficiency and providing light, Made communication easier.
The use of stained glass has increased the dynamics of the space, In such a way that the rhythmic sparkle covers the space.
Location
Azadegan road, Pegah Dairy Factory, Isfahan, Iran
Project implementation year
2021
More project images
https://drive.google.com/drive/folders/1YX7peADIGDQ4OPECZt9v8uaYSlTAZuc9?usp=sharing
Applicant and authors of the project
Polsheer Architects.
Established in 1981 is considered today as one of the leading consulting firms in Iran , providing a wide range of consulting services in field of design and supervision.
Over the past four decades, Polsheer has undertaken the design and supervision of a large number of distinguished building projects, and developed valuable experience in special concepts that enabled the firm to pre-qualify for participation and winning in several local and international competitions.
Architects Mohammadreza Ghaneei, Ashkan Ghaneei, Mariam Alikhanirad
Other participants
Technical unit: Mohammad Hadian, Emam jome zade
Structure: Nahid Soleimani,Mohammad Shafai
Supervisors: Nadia Fereidoon, Mehrdad Mardiha