Project
Work to Play

Category 
Best Project of Public Building or Facility

About the project (provided by the applicant)
Our project is a transformation of an existing office into a post-COVID, adaptive family-inclusive office. We envisioned a low-carbon impact family-friendly workplace that increases the health of the occupants through an air-filtering façade. The alluring dichroic laminated facade allows for a multi-use system; cross-laminated timber fins provide structural support, and other aluminum fins self-containing HVAC filtration systems bring filtered fresh air into the air supply system within the building. By carving into the existing structure, the project preserved most of the existing structures for low-carbon impact design while successfully transforming the building into a new, family-inclusive office. The new programming prioritizes children’s spaces, with a playground, childcare center, and micro play spaces distributed throughout the building; parents in the office can bring their children to work without worrying about external health exposure in these uncertain times.

Location
New York, United States

Project design year
2022

Extra visual materials
https://work-to-play.glitch.me/

Applicant
Muci Yue, San Francisco based architect

Author of the project
Muci Yue

Status of the project
Conceptual design

2024 USER’S ONLINE VOTING IS COMPLETED.

Thank you for your participation and support of the nominees!

Premio del Pubblico (People’s Choice) finalists, absolute winner and winners in the categories can be found here.

0