About the project (provided by the applicant) The project site is located in the Salaryevo district of Moscow. The designed facility is a universal production module of a waste processing plant, part of a complex of identical modules. This approach allows the module to be replicated and adapted in other districts.
The architectural form of the building is bionic. The main goal was to visually connect the industrial and technological function with natural forms.
The waste processing workflow includes several stages:
Processed materials are collected in 1100-liter containers within dedicated internal spaces. Access for specialized vehicles to unload materials is provided from both the west and east sides of the building via designated driveways.
The protruding “ribbon” elements of the building function as filters for exhaust gases. Their elongated design ensures maximum removal of harmful carbon dioxide impurities.
Location Moscow, Russia
Project design year 2023
Applicant Scientific Supervisor: Galina Gennadyevna Gryaznova, Department of Architectural Design, 4th Year
Authors of the project Student: Artyom Vyacheslavovich Kuznetsov
Visualization Artyom Vyacheslavovich Kuznetsov
Status of the project Conceptual design
We use cookies
We use cookies to improve your experience and analyze traffic. You can customize your preferences.
Cookie preferences
Necessary
Always enabled
These cookies are essential for the website to function and cannot be disabled.
Analytics
Recommended
These cookies help us analyze how the website performs.